NASA Identifies 13 Lunar Regions Where Artemis 3 Crew Could Land

NASA Identifies 13 Lunar Regions Where Artemis 3 Crew Could Land

NASA is on the verge of finally launching the first Space Launch System (SLS) rocket after years of development. The Artemis 1 mission won’t have a crew onboard, but by the third launch, the SLS will be taking astronauts back to the moon for the first time in 50 years. Before that happens, NASA needs to decide where on the lunar surface to send them. The agency has now identified 13 candidate regions near the moon’s south pole.

The Apollo Program decades ago clustered the landings closer to the equator, far from the polar regions. However, NASA believes there’s a lot to be learned from the poles, which have more extreme terrain, with areas that are permanently illuminated or in shadow. Astronauts will be able to search for lunar resources, including water ice. “Several of the proposed sites within the regions are located among some of the oldest parts of the Moon, and together with the permanently shadowed regions, provide the opportunity to learn about the history of the Moon through previously unstudied lunar materials,” says Sarah Noble, head of the Artemis lunar science division.

NASA Identifies 13 Lunar Regions Where Artemis 3 Crew Could Land

NASA says each of the 13 landing regions has multiple locations for a safe Artemis 3 touchdown — the job of one or more commercial landers rather than the Orion spacecraft that launches on the SLS. Here are the 13 regions being considered for the historic landing.

  • Faustini Rim A
  • Peak Near Shackleton
  • Connecting Ridge
  • Connecting Ridge Extension
  • de Gerlache Rim 1
  • de Gerlache Rim 2
  • de Gerlache-Kocher Massif
  • Haworth
  • Malapert Massif
  • Leibnitz Beta Plateau
  • Nobile Rim 1
  • Nobile Rim 2
  • Amundsen Rim

NASA considered several factors in choosing these locations, including the terrain slope, ease of communication with Earth, and lighting conditions. This is based on the expected capabilities of the SLS, Orion, and Starship HLS (human landing system). NASA is still accepting bids for a second commercial lander following objections from Blue Origin, but it’s likely SpaceX will be the only firm ready to fly by the time Artemis 3 launches.

Before nailing down a landing site, NASA will discuss the options with the larger scientific and engineering communities. The future development of SpaceX’s HLS is also an important factor. The company has yet to get Starship into orbit, and this vehicle is just as important as the SLS to getting astronauts to the moon and back safely.

Artemis 1 should launch later this month, and then Artemis 2 will complete a crewed lunar flyby in 2024. Artemis 3 is slated to land on the moon in one of these 13 regions in 2025. These dates could, of course, be pushed back as they have been many times in the past. It may not even be the SLS’s fault for once — NASA still needs new spacesuits.

Continue reading

Intel Launches AMD Radeon-Powered CPUs
Intel Launches AMD Radeon-Powered CPUs

Intel's new Radeon+Kaby Lake hybrid CPUs are headed for store shelves. Here's how the SKUs break down and what you need to know.

SpaceX Launches ‘Better Than Nothing’ Starlink Beta
SpaceX Launches ‘Better Than Nothing’ Starlink Beta

Those lucky few who have gotten invitations to try the service will have to pay a hefty up-front cost, and the speeds aren't amazing. Still, it's a new generation of satellite internet.

Samsung, Stanford Built a 10,000 PPI Display That Could Revolutionize VR, AR
Samsung, Stanford Built a 10,000 PPI Display That Could Revolutionize VR, AR

Ask anyone who has spent more than a few minutes inside a VR headset, and they'll mention the screen door effect. This could eliminate it for good.

New Intel Rocket Lake Details: Backwards Compatible, Xe Graphics, Cypress Cove
New Intel Rocket Lake Details: Backwards Compatible, Xe Graphics, Cypress Cove

Intel has released a bit more information about Rocket Lake and its 10nm CPU that's been back-ported to 14nm.